The same dozen clauses come up job after job. The Building Code clauses and standards that building services work in New Zealand and Australia keeps returning to, grouped by topic, with the paperwork that proves compliance.
G4The Building Code clause for ventilation in New Zealand
AS 1668Mechanical ventilation, natural ventilation, and fire and smoke control
PS1–PS4Producer statements for design, design review, construction and construction review
Ventilation and indoor air
Document
What it covers
NZBC G4 and G4/AS1
Ventilation in New Zealand buildings; points to the standards below
NZS 4303:1990
Outdoor air rates for acceptable indoor air quality, cited by G4/AS1
AS 1668.2
Mechanical ventilation: outdoor air, exhaust rates (toilets, kitchens, car parks)
AS 1668.4
Natural ventilation of buildings
AS/NZS 3666
Microbial control of air-handling and water systems, including cooling towers
Fire and smoke
Document
What it covers
AS 1668.1
Fire and smoke control in HVAC systems: smoke spill, pressurisation, fire mode
NZBC C clauses and C/AS1–C/AS2, C/VM2
Protection from fire in New Zealand
EN 12101-3
Testing of powered smoke exhaust fans
Energy and envelope
Document
What it covers
NZBC H1
Energy efficiency, insulation and HVAC system requirements
NCC Section J
Energy efficiency in Australian commercial buildings
AS/NZS 4859.1
Thermal insulation materials
Refrigeration and plumbing
Document
What it covers
AS/NZS 5149 parts 1–4
Refrigerating systems and heat pumps: safety, refrigerant charge limits, installation
AS/NZS 3500
Plumbing and drainage, including sanitary drainage gradients
AS 1056.1
Storage water heaters
Ductwork and plant
Document
What it covers
AS 4254.1 and AS 4254.2
Flexible and rigid ductwork
NZS 4219:2009
Seismic restraint of building services
AS/NZS 1170.2
Wind actions on roof-top plant and structures
Electrical and controls
Document
What it covers
AS/NZS 3000
Wiring Rules
NZECP 34
Safe distances from overhead power lines
IEC 60034 and IEC 60079
Motors; equipment for explosive atmospheres
Steel and fabrication
Document
What it covers
AS/NZS 1554
Structural steel welding
AS 1210 and AS 1692
Pressure vessels; steel tanks for flammable liquids
ISO 898-1 and AS 2129
Bolt property classes; pipe flanges
AS 1668 and NZS 4303: which part covers what
Most ventilation questions on an Australian or New Zealand job land in one of these documents. Knowing which part to open, and roughly where in it to look, saves most of the time people lose to searching.
Document
Scope
You open it when
AS 1668.1 Fire and smoke control in buildings
How air handling behaves in a fire: smoke hazard management, zone and stair pressurisation, smoke exhaust, and the fans, dampers and controls that have to keep working.
Setting the fire mode sequence, specifying fire and smoke dampers, or sizing a smoke exhaust or pressurisation fan.
AS 1668.2 Mechanical ventilation in buildings
Outdoor air for occupied spaces, exhaust from toilets, kitchens, car parks and plant rooms, where intakes and discharges may sit relative to each other, and limits on recirculation.
Working out the outdoor air rate, an exhaust rate, or whether a discharge is far enough from an intake.
AS 1668.4 Natural ventilation of buildings
When openable area can do the job instead of a fan, and how much of it is needed.
Arguing that a space does not need mechanical ventilation, or sizing car park openings.
NZS 4303 Ventilation for acceptable indoor air quality
The New Zealand ventilation rates, as a ventilation-rate procedure and an indoor air quality procedure. It was built on the ASHRAE 62 of its day, so the structure will look familiar.
Any NZ job where G4 compliance goes down the Acceptable Solution route rather than an alternative solution.
NZBC G4 / AS1 Ventilation
The Building Code clause itself and its Acceptable Solution, which is what cites NZS 4303 and AS 1668 in New Zealand.
Establishing what you actually have to comply with before you open any standard.
NCC Volume One, Section F and Section E
The Australian equivalent: F6 for ventilation, Section E for fire services and smoke hazard management, calling up AS 1668 parts as the Deemed-to-Satisfy route.
Any Australian job, before you reach for AS 1668 itself.
What is not here, on purpose: the rate tables. AS 1668 and NZS 4303 are sold, not published, and their licences do not allow their tables or clause text to be reproduced. The figures you need are in the copy your office holds or in a Standards New Zealand or Standards Australia subscription, and the edition cited by the Building Code or the NCC is the one that counts. Rates also change between editions, so a number copied from a website is worth less than the five minutes it takes to open the standard.
Paperwork that proves compliance
Design and building consent
PS1 design producer statement from the designer; PS2 design review where required.
Specified systems (mechanical ventilation, smoke control) listed on the compliance schedule.
Construction and completion
PS3 from the installer and PS4 construction review from the engineer.
Electrical certificates of compliance and records of work from licensed practitioners.
Commissioning records, then the building warrant of fitness (BWOF) checks each year with IQP inspections.