Water, fire and power
Electrical services
Mechanical plant is often the biggest load on the board, and the one added last. Supply and switchboards, maximum demand and cable sizing, power to plant, lighting and emergency lighting, and the newer loads: solar, batteries and EV chargers.
230 / 400 VSingle-phase and three-phase low-voltage supply in New Zealand and Australia
AS/NZS 3000Wiring Rules, including maximum demand methods
AS/NZS 3008.1Cable selection: current rating, voltage drop and short-circuit
Supply and distribution
From the network to the board
- Small buildings take a low-voltage supply from the lines company; large ones get their own transformer and a main switchboard (MSB).
- Three-phase is about 400 V between phases and 230 V phase to neutral; spread single-phase loads evenly across the phases.
- Distribution boards on each floor or zone, with separate boards or sections for mechanical plant and essential loads.
Protection
- Circuit breakers protect cables from overload and short circuit; RCDs protect people from earth leakage.
- Discriminate (grade) breakers so a fault trips only the nearest device.
- Surge protection at the main board, especially for sites with sensitive electronics.
Maximum demand and cables
Maximum demand
- Estimate it by calculation, by measurement of a similar building, or by limitation, following AS/NZS 3000.
- Mechanical plant is often the largest load; get real kW and starting currents from the mechanical engineer early.
- Allow spare capacity for future fit-outs and EV charging.
Cable selection
- Size for current rating in the installation method, then check voltage drop (commonly 5% total from the point of supply) and fault level.
- Derate for grouping, thermal insulation and high ambient temperature.
- Fire-rated cables for life-safety systems that must keep working in a fire.
Power to mechanical plant
Who supplies what
- Agree the split early: usually the electrician runs power to a local isolator and the mechanical contractor wires from there.
- Mechanical switchboards (MSSB) hold starters, VSDs, controls and BMS interfaces.
- Lockable isolators within sight of each motor for maintenance.
Watch for
- Motor starting current and VSD harmonics on generator-backed boards.
- IP rating of isolators on roofs; UV-stable enclosures.
- Fire mode signals from the fire panel to the MSSB.
Lighting and emergency lighting
General lighting
- Design to illuminance targets for each task (AS/NZS 1680 series) and energy limits (NZ H1 for commercial lighting; NCC Section J in Australia).
- Occupancy and daylight sensors, and DALI or similar control on larger sites.
Emergency lighting
- Emergency lights and illuminated exit signs to AS/NZS 2293 along escape routes.
- Batteries must run them for at least 90 minutes; tested every six months, with a monthly visual check.
- Central test systems log the results automatically for the compliance schedule.
Solar, batteries and EV charging
New loads and sources
- Grid-connected inverters must meet AS/NZS 4777 and the lines company’s connection rules.
- Battery systems need ventilation, fire separation and safe access to suit their chemistry.
- EV chargers add large, long-duration loads; use load management so the supply is not exceeded.