Duct that is too small costs fan power for the life of the building; duct that is too big takes ceiling space nobody gave you. Sizing methods, the velocity limits that keep a system quiet, standard sizes and pressure classes, and how to total the pressure the fan has to beat.

≈1 Pa/mTypical friction rate for equal-friction sizing of commercial low-pressure ductwork
4–5 m/sMain duct velocity for quiet offices; 5–6 m/s for general commercial, 6–8 m/s in plant rooms
7.6–10 m/sCommercial kitchen exhaust duct velocity, high enough to keep grease moving

Ductulator

Size a duct against a velocity limit and a friction limit at the same time, in metric or inch-pound units. Rigid galvanised duct and flexible duct are not the same pipe, so pick the material before you read the answer.

It solves the Colebrook-White friction factor and uses the ASHRAE circular equivalent De = 1.30 (ab)^0.625 / (a+b)^0.25 for rectangular ducts, so the figures line up with a printed duct calculator. Velocity shown is the real velocity in the duct, which is the one that matters for noise. This sizes straight duct only: bends, takeoffs, dampers and the unit itself still have to be added up.

Sizing methods

Equal friction

  • Pick one friction rate (about 1 Pa per metre for low-pressure commercial work) and size every section to it with a duct calculator.
  • Simple and fast, and the usual method for supply and return systems in offices, schools and retail.
  • Long runs end up with more pressure loss than short ones, so balance with dampers.

Static regain and even pressure

  • Size so the static pressure at each branch is about the same, which suits long trunks and VAV systems.
  • The aim is a low, even static pressure across all terminals, not a fixed friction rate.
  • Even pressure is not the same as a constant-pressure control strategy; it is a sizing approach.

Adding up fittings

  • For the index run (the path with the highest resistance), list every straight length, bend, tee, transition and damper.
  • Take loss coefficients from the ASHRAE Duct Fitting Database and multiply by the velocity pressure.
  • Add equipment losses from data sheets: filters (at their dirty value), coils, heaters, attenuators, fire dampers and grilles.
  • The total is the external static pressure the fan must deliver at the design airflow.

Velocity limits

DuctQuiet spacesGeneral commercialNotes
Main supply4–5 m/s5–6 m/sHigher velocity means smaller ducts but more noise and pressure loss.
Branch≤4 m/s4–5 m/sSlow down near diffusers to keep regenerated noise low.
Flexible duct≤3 m/s3–3.5 m/sFlex has more friction and noise than rigid duct; keep runs short and straight.
Return4–5 m/s5–6 m/sCan run a little faster than supply because it is further from people.
Kitchen exhaust–7.6–10 m/sKeeps grease and dust from settling in the duct.

Sizes worth remembering

Round duct

  • Common diameters: 100, 125, 150, 200, 250, 315, 355, 400, 450, 500, 560 and 630 mm. 315 is now more common than 300 on new work.
  • At about 3 m/s: 100 mm ≈ 24 L/s, 150 mm ≈ 53 L/s, 200 mm ≈ 94 L/s, 250 mm ≈ 147 L/s, 300 mm ≈ 212 L/s, 400 mm ≈ 377 L/s.
  • Airflow (L/s) = velocity (m/s) × area (m²) × 1000.

Flexible duct to a diffuser (rule of thumb)

  • Up to 50 L/s: 150 mm
  • 51–100 L/s: 200 mm
  • 101–200 L/s: 250 mm
  • 201–250 L/s: 300 mm
  • 251–350 L/s: 350 mm
  • 351–450 L/s: 400 mm

Rectangular duct

  • Use the equivalent diameter (Huebscher) to compare a rectangular duct with a round one of the same friction.
  • Keep the aspect ratio below about 4:1; flat ducts cost more sheet metal and lose more pressure.
  • The duct sizer in the HVAC Quote Playbook does both conversions.

Duct types and materials

Nearly every commercial job is galvanised steel, and nearly every argument is about the bits that are not. The material decides the roughness, the leakage class, how it is cleaned and whether it survives what is inside it.

TypeWhat it isWhere it suitsWatch for
Rectangular galvanisedFolded sheet steel with cleated or flanged joints, stiffened on the flatsThe default where ceiling depth is tight and the shape has to suit the spaceLeakage and drumming at the flats; it uses more metal and more sealant per litre than round
Spiral roundMachine-wound strip, with sealed slip or coupling jointsAnywhere you can give it the height: stiffer, tighter and lower friction than rectangularFittings cost more and take longer, and the sizes are fixed steps
Flat ovalA round duct squashed, keeping most of the stiffness in less depthThe compromise when round will not fit but you want its behaviour
FlexibleA wire helix in a plastic or foil sleeve, usually with an insulation blanket over itThe last short connection to a diffuser, and nothing elsePressure loss several times rigid duct when compressed, which is the usual reason a house system underperforms
Semi-rigid radial tubeSmooth-bore plastic or aluminium tube, run one per valve from a manifoldHeat recovery systems in houses: easy to balance, easy to cleanEvery run should be a similar length, or balancing becomes guesswork
Rigid fibreglass duct boardPreformed insulating board cut and taped into ductLow-cost insulated duct in dry, clean, low-pressure systemsThe air side is the insulation: it erodes, it holds dirt, and it cannot be cleaned hard
Pre-insulated panelPhenolic or PIR panel with foil facings, cut and assembled on siteRetrofits and tight ceilings: insulation and duct in one thickness, and light to handleJoint quality is everything, and it needs fire and smoke properties checked for the application
Fabric / textileA hung fabric sock that distributes air through its weave or through orificesFood, sport and industrial halls: even low-velocity distribution, and it washesIt needs a minimum pressure to stay inflated, and it drops when the fan stops
Stainless steelUsually 304, or 316 where chlorides are in playKitchen grease duct, laboratory exhaust, clean rooms, wash-down areasCost, and that welded grease duct is a different trade from sheet metal
PVC, polypropylene and FRPPlastic or fibreglass duct for air that eats steelPlating, wastewater, laboratory fume, pool hallsFire performance and support spacing: plastic sags and burns differently from steel
Welded grease ductContinuously welded, liquid-tight, falling back to the hood or a drain pointCommercial kitchen exhaust, where the duct is part of the fire riskAccess panels at every change of direction, and a cleaning regime that actually happens
Fire-rated ductPurpose-made or board-wrapped duct that keeps working, or keeps fire out, for a rated periodSmoke spill, stair pressurisation and any duct crossing a fire compartment without a damperThe rating belongs to the tested system, including supports and penetrations, not to the board alone

Two numbers follow from the material and the build, not from the size: the roughness, which the Ductulator above lets you change, and the leakage class, which decides how much of the air you paid to move never reaches the room. On a large system an untested leakage class is a bigger number than most of the fittings you argued about.

Construction and pressure classes

Standards

  • AS 4254.1 (flexible duct) and AS 4254.2 (rigid duct) in Australia and New Zealand; SMACNA is often quoted for detail.
  • Galvanised sheet to AS 1397; keep the zinc coating intact and repair cut edges.
  • Flanged joints with a slide-on flange system; cross-break or bead larger panels so they do not drum.

Pressure classes (a common split)

  • Low pressure: fan static below about 750 Pa.
  • Medium pressure: about 750–1500 Pa.
  • High pressure: about 1500–2500 Pa.
  • Higher classes need heavier gauge, tighter sealing and leakage testing; check the project specification.

Fittings

  • Bend centreline radius at least equal to the duct width; use turning vanes where it cannot be.
  • Branch with 45° shoe or bellmouth take-offs rather than square tees.
  • Leave straight duct before and after fans, dampers and attenuators so the airflow is even.

Quick airflow estimates for houses

Early-stage numbers for ducted heat pumps before a room-by-room load calculation. Check them against the heat load and the unit data.

ModeAir changesPer floor areaPer kW
Heatingabout 5.5 per hourabout 4 L/s per m²about 33 L/s per kW
Coolingabout 12 per hourabout 8.7 L/s per m²about 72 L/s per kW
Evaporative coolingabout 30 per hourabout 22 L/s per m²about 180 L/s per kW

Supply airflow (L/s) = room length × width × height (m) × air changes per hour ÷ 3.6.

Related guides and tools

Sources

Checked October 2026. Standards and rules change; confirm the current edition before you rely on them.

  1. ASHRAE Handbook – Fundamentals, Duct Design chapter
  2. ASHRAE Duct Fitting Database
  3. Standards Australia: AS 4254 Ductwork for air-handling systems in buildings
  4. AIRAH DA guides (design application manuals)