Auxuro

Controls and electrical

Controls, drives and sensors

A controller sends a signal and something in the plant room moves. This is what those signals are: 0–10 V and 4–20 mA, Modbus and BACnet, variable speed drives, EC motors, single-phase speed control, sensors, and enough New Zealand wiring practice to connect it all safely.

4–20 mAA live zero: below about 3.5 mA the controller knows the wire is broken
120 ΩOne termination resistor at each end of an RS-485 bus, and nowhere else
24 V on STOSafe Torque Off needs 24 V DC to allow the drive to run; 0 V stops it

Signals

SignalHow it worksUse it forWatch for
0–10 VVoltage: 0 V = 0%, 5 V = 50%, 10 V = 100%Fan speed, damper actuators, EC motorsA broken wire looks like 0%. Needs a common 0 V with the controller.
4–20 mACurrent loop: 4 mA = 0%, 20 mA = 100%Sensors on long runs, industrial and safety-related signalsDetects broken wires; check whether the device is loop-powered.
Dry contactVolt-free switch: open or closedEnable, fire alarm, run and fault status, flow and filter switchesNormally open versus normally closed changes the logic; fail-safe inputs use normally closed.
Modbus RTUMaster and slaves on RS-485, binary frames with CRC checkDrives, meters, EC fans, sensorsAddresses are set by hand; A to A, B to B (some makers label them the other way).
BACnet MS/TP and BACnet/IPObject-based building automation protocolFull BMS, chillers, VRF gatewaysMore capable and more complex; BACnet/IP may use DHCP, MS/TP needs fixed addresses.

NAMUR NE 43: what a 4–20 mA signal means outside 4–20 mA

The useful thing about a current loop is that it can tell you it is broken. NAMUR NE 43 is the recommendation that says which currents are a measurement and which are the transmitter reporting a fault, so a controller can tell a genuinely cold room from a dead sensor. Most process transmitters follow it; most cheap HVAC transmitters do not, so check before you rely on it.

04812162024loop current, mAfailure≤ 3.63.8–4.0under-rangemeasuring range 4.0 – 20.0 mA = 0 – 100%20.0–20.5over-rangefailure≥ 21.0Only 3.8 to 20.5 mA is a measurement. The narrow grey bands at 3.6–3.8 and 20.5–21.0 mA are undefined: treat them as a fault.
The NAMUR NE 43 bands. Only 3.8 to 20.5 mA is a measurement; outside it the transmitter is telling you something is wrong.
CurrentNE 43 calls itWhat it meansWhat the controller should do
0 mANo signalOpen circuit, or the loop has lost its supplyAlarm the point as failed. Hold the last good value or go to a safe default, never to 0%.
≤ 3.6 mAFailure, down-scaleThe transmitter has detected a fault in itself and driven the loop low on purposeAlarm. This is a fault signal, not a very low reading.
3.6 to 3.8 mATransitionUndefined: some makers alarm here, some do notTreat as failed unless the data sheet says otherwise.
3.8 to 4.0 mAUnder-rangeA live measurement below the bottom of the calibrated rangeUse it, and flag that the sensor is off the bottom of its range.
4.0 to 20.0 mAMeasuring range0% to 100% of the calibrated span: the normal signalScale and use it.
20.0 to 20.5 mAOver-rangeA live measurement above the top of the calibrated rangeUse it, and flag that the sensor is off the top of its range.
20.5 to 21.0 mATransitionUndefined, the same as the low transition bandTreat as failed unless the data sheet says otherwise.
≥ 21.0 mAFailure, up-scaleThe transmitter has detected a fault and driven the loop high on purposeAlarm. On a heating or safety loop, up-scale is usually the safer failure direction.

Pick the failure direction to suit the duty, because the transmitter usually lets you choose. On a heating coil a down-scale failure reads as cold and the valve opens, which can cook the room; up-scale reads as hot and the valve closes, which is the safer way to fail. On a cooling or CO loop it is the other way round. This is also the whole argument against 0–20 mA and 0–10 V on anything that matters: a broken wire reads as 0% and looks like perfectly good news.

RS-485 wiring

Daisy chain, not star

  • Run twisted pair from one device to the next in a line.
  • Fit a 120 Ω termination resistor at each end of the line only.
  • Carry the signal common (0 V or GND) with the pair, and earth the screen at one end.

When devices go offline

  • A and B swapped: the device never answers.
  • Two devices on one address: data clashes and readings jump.
  • Baud rate, parity or stop bits differ from the master.
  • No power at the device, or a missing termination on a long bus.

Variable speed drives

Setting up a drive for HVAC

  • Enter the motor nameplate data: voltage, current, power, speed and frequency.
  • Set minimum frequency (about 15 Hz for fans) and maximum 50 Hz, with sensible ramp times.
  • Choose the start source (a digital input from the BMS or a switch) and the reference source (AI1, fieldbus or a constant speed).
  • Set AI1 for volts or milliamps to match the sensor; a mismatch reads as zero or full scale.

BMS or potentiometer

  • Automatic control: the BMS sends 0–10 V or 4–20 mA to AI1 and a run enable to a digital input.
  • Manual control: a potentiometer on the drive’s own +10 V reference, AI1 and analogue ground.
  • Jumpering the Safe Torque Off terminals only allows the drive to run; it does not select a speed.
  • Many drives can start and stop themselves on a supervised signal, for example run when AI1 rises above 2 V.

Motors

  • Reverse a three-phase motor by swapping any two phases with the power off, or by a drive parameter.
  • A 230/400 V motor is wired star on a 400 V three-phase supply and delta on 230 V three-phase; follow the nameplate.
  • IEC 60034 covers motor performance and the IE1–IE5 efficiency classes; IEC 60072 covers frame sizes.
  • Use the motor’s thermal protection (PTC thermistors or thermal contacts) in the control circuit; disconnected protection is a common cause of burnt motors.

EC motors and single-phase speed control

EC motors

  • The drive is built into the motor: filter, rectifier, inverter and a microcontroller.
  • Control wires: a +10 V supply for a potentiometer, ground, a 0–10 V or PWM speed input, and a tacho output.
  • Colours are not standard; read the motor label and confirm with a meter.
  • The tacho output is usually open collector, so it needs a pull-up resistor to read.
  • Do not switch the mains supply on and off with a timer; switch the enable or the speed signal instead.

Single-phase AC motors

  • Transformer and TRIAC controllers lower the voltage, not the frequency.
  • Torque falls with voltage squared, so below a minimum setting the motor stalls and hums.
  • TRIAC phase-angle control switches on part-way through each half cycle, cutting the front of the wave; allow 15–25% current margin.
  • Terminals U1 and U2 are the main winding; Z1 and Z2 the auxiliary (capacitor) winding.

Sensors and relays

Sensors

  • CO₂ sensors use NDIR and output 0–10 V or 4–20 mA, often with a relay and display.
  • Demand-controlled ventilation: run at low speed until CO₂ reaches about 800 ppm, then ramp to design flow by about 1200 ppm.
  • Check the supply voltage version: a 120 V model will not run on 230 V.
  • Heat recovery units use four probes: supply, extract (from the rooms), outdoor and exhaust; the controller uses them for bypass and frost protection.

Relays and switches

  • A current-sensing switch closes a dry contact when motor current passes a threshold, proving the fan runs.
  • Run-on timers keep a fan going for a set time after the light switch goes off.
  • Float switches start condensate pumps; reed switches on doors close when the magnet is near.
  • Interposing relays separate a 24 V control output from a 230 V load.

New Zealand wiring basics

Colours and circuits

  • Current colours: brown live, blue neutral, green/yellow earth. Older houses: red live, black neutral, green earth.
  • Socket circuits are usually 20 A; lighting 10 A or 16 A. Larger breakers need larger cable by design.
  • In a lamp holder the centre contact goes to the switched live and the screw shell to neutral.

Who may do what

  • Fixed wiring and switchboards are prescribed electrical work for a licensed electrician, with a certificate of compliance.
  • Homeowners may do some limited work under the Electrical (Safety) Regulations, which must then be inspected.
  • Wiring rules: AS/NZS 3000. Safe distances from overhead lines: NZECP 34.

The standards a controls job is held to

Nobody reads all of these. The useful skill is knowing which one the question belongs to, so you can open the right document instead of arguing from memory on site.

The questionWhere it is settledApplies in
Can I run this cable here, and what protects it?AS/NZS 3000 Wiring Rules, with AS/NZS 3008.1 for cable selectionNZ and AU
Who is allowed to connect it?NZ: Electricity (Safety) Regulations and the registration classes. AU: the state electrical licensing act.NZ and AU
Is this control panel built properly?AS/NZS 61439 for low-voltage switchgear and controlgear assembliesNZ and AU
How safe does this interlock have to be?ISO 13849-1 or IEC 62061 for machinery; IEC 61508 and 61511 where it is a process safety functionInternational
What does Safe Torque Off actually guarantee?IEC 61800-5-2 for drive safety functions, read with the drive’s own safety manualInternational
Will it interfere with anything, or be interfered with?IEC 61800-3 for drives (C1 to C4 categories), AS/NZS CISPR 11 generallyNZ and AU
What does this IP or IK rating mean?IEC 60529 for IP, IEC 62262 for IKInternational
Is my 4–20 mA fault signalling right?NAMUR NE 43, with IEC 60381-1 for the signal itselfInternational
Is my RS-485 bus within spec?TIA/EIA-485-A for the electrical layer; the protocol spec on top (Modbus, BACnet MS/TP)International
Does my BACnet device really do BACnet?ASHRAE 135 (ISO 16484-5), with the device’s PICS and BTL listing as the evidenceInternational
What has to happen in a fire?AU: AS 1668.1 and NCC Section E. NZ: the fire report and the compliance schedule for that specified system.NZ and AU
How do I prove it works at handover?CIBSE Commissioning Code A to W by discipline, and NEBB or AIRAH procedures for air and water balancingInternational

Editions move, and the edition the Building Code or the NCC calls up is the one that binds you, not the newest one on the publisher’s site. Check the cited edition before you quote a clause at anyone.

Related guides and tools

Sources

Checked October 2026. Standards and rules change; confirm the current edition before you rely on them.

  1. Modbus Organization: Modbus over serial line specification
  2. ASHRAE Standard 135 BACnet
  3. IEC 60034 Rotating electrical machines
  4. WorkSafe NZ: electrical work you can do yourself
  5. AS/NZS 3000 Wiring Rules