Auxuro

Online training

Electrical plan training

Circuits are easy until you have forty of them and someone asks for the maximum demand. Electrical plan keeps the layout, the circuit schedule and the cable sizing in one place so they cannot drift apart.

AS/NZS 3000The Wiring Rules the layout and protection are checked against
AS/NZS 3008.1Cable selection: current rating, voltage drop and short circuit
5%Total voltage drop allowed from the point of supply to the last outlet

Step by step

  1. Draw the planTrace the building and name the rooms, then set the supply: single or three phase.
  2. Place the pointsLights, switches, socket outlets, fixed appliances and the mechanical plant.
  3. Group into circuitsAssign points to circuits. Keep lighting and power separate and spread load across phases.
  4. Set protectionPick the breaker for each circuit and group the RCDs so one fault does not take the house out.
  5. Run maximum demandThe tool totals the connected load and applies the method, so you can size the main.
  6. Size the cablesEach run is checked for current rating and voltage drop against its length and install method.
  7. Smoke alarms and wet areasPlace interconnected alarms and check the zones around baths and showers.
  8. Export the scheduleA circuit schedule with cable size, protection and voltage drop for every run.

What the tool checks for you

CheckWhat it meansWhat to do when it flags
Voltage dropThe run is long enough that the end voltage falls too farGo up a cable size, or move the board closer
Circuit loadingToo many points on one circuit for its protectionSplit the circuit, or raise the protection and cable together
RCD groupingOne RCD covers so much that a single fault blacks out the houseSplit across more RCDs; keep lighting and power apart
Wet area zonesA point sits inside a zone it is not rated forMove it, or use fittings rated for that zone
Phase balanceOne phase carries much more load than the othersMove circuits between phases until they even out

Where to go next