Sydney Home Owner's Handbook
A working handbook for the whole life of a Sydney home: what to check before you exchange, what the land and the building era tell you, what needs approval, what owning really costs, and how a sale nets out. Each tab has a tool you can use on a real property.
Choose a house: read its era, its title and its block
Price and layout are easy to compare. Three things are not, and they drive most of the surprises after settlement: how and when the house was built, what kind of title it sits on, and what the ground under it does in heavy rain, heat or fire.
House-era decoder
Pick when the house (or the part you are looking at) was built. You get the usual construction in Sydney, the weak points inspectors look for, and the questions to ask.
Title types you will meet in Sydney
| Title | What you own | Watch for |
|---|---|---|
| Freehold (Torrens title) | The land and the house on it. | Easements, restrictions on use and positive covenants on the title; the section 10.7 planning certificate. |
| Strata title | Your lot plus a share of common property, run by an owners corporation. | Get a strata inspection report: levies, capital works fund, minutes, by-laws, building defects and cladding orders. |
| Community title | A lot in a community scheme with shared roads, parks or facilities. | Management statement, levies and any shared infrastructure costs. |
| Company title | Shares in a company that owns the building. | Board approval to buy, rules on renting, and fewer lenders. |
Ask your conveyancer for the title search and every instrument registered on it before you commit.
How it is being sold changes how you prepare
Auction
Unconditional, with no cooling-off. Finance, inspections and the contract review happen first.
Private treaty
Contracts exchange after negotiation. Cooling-off is 5 business days unless you waive it with a section 66W certificate from your solicitor or conveyancer.
Expressions of interest
Written offers by a date; the seller can negotiate with anyone at any time.
Verify before you commit
Once the contract is unconditional you are committed. Use the time before you sign, and any cooling-off or conditions, to turn unknowns into a price, a fix or a walk-away. This checklist saves in your browser so you can run one property at a time.
What the seller must give you (NSW)
In NSW the seller must have a contract for sale ready before the property is marketed. It must include the title search, the section 10.7 planning certificate, the sewer and drainage diagram, and (where there is a pool) a pool compliance or non-compliance certificate. Agents must not underquote.
Cooling-off (NSW)
Cooling-off: 5 business days after the contract is made (10 for off-the-plan). Pulling out costs 0.25% of the price. There is no cooling-off at auction, and you can waive it with a section 66W certificate.
Due diligence checklist
Checklist for one property
0 done ·Unapproved work: how to handle it
Find it
Compare the approvals on the council's file with what is on site. Built-in garages and carports, rooms under houses, decks, pergolas, granny flats, extra bathrooms and pools are the usual gaps.
Size it
Cosmetic work rarely matters. Structure, wet areas, drainage, retaining walls and anything near a boundary matter more, because they affect safety, insurance, lending and resale.
Fix the paperwork
Councils and building surveyors can often approve existing work after the fact (names differ by state: building certificate, certificate of final inspection, retrospective approval), but they may ask to open up linings or require upgrades.
Decide
Options are: the seller gets it approved before settlement, a price reduction that covers the fix, a specific condition, or walking away. Tell your insurer and lender what you know.
Land and water hazards
Sydney sits on sandstone ridges and shale clays, with river flats in the west, steep harbour and coastal slopes, acid sulfate soils near waterways, bushland woven through the suburbs, and some areas over old coal mines. The Hawkesbury-Nepean and Georges River floods are a reminder of where water goes. Insurers, lenders and councils all look harder at this now. Check these layers for any address before you commit.
| Hazard | What it looks like on site | Where to check | Who to ask |
|---|---|---|---|
| Flooding | River flats, creeks, low streets, garages below the road. | Section 10.7 planning certificate (flood planning); council flood studies. | Insurer before exchange; a flood engineer if the lot is affected. |
| Bushfire prone land | Bush on the lot or nearby: much of the North Shore, Hills, south and west. | Planning certificate; NSW Planning Portal spatial viewer. | A bushfire consultant for a BAL rating before you build or extend. |
| Landslip and steep slopes | Cracked retaining walls, leaning trees, harbour and coastal cliffs. | Council geotechnical hazard maps; planning certificate. | A geotechnical engineer. |
| Reactive clay | Cracks in brick that open in summer, sticking doors, sloping floors. | Building inspection. | A structural engineer. |
| Mine subsidence | Mostly outside the main city: parts of the south-west, Illawarra and Central Coast. | Planning certificate (mine subsidence district). | Subsidence Advisory NSW. |
| Loose-fill asbestos | Older homes with fluffy roof-space insulation. | NSW Fair Trading loose-fill asbestos register. | A licensed asbestos assessor. |
| Acid sulfate soils and contamination | Low-lying land near rivers and bays; former industrial sites. | Local environmental plan maps; planning certificate; EPA records. | An environmental consultant. |
Who looks after which pipe
Your private drains
Pipes from your fixtures to the sewer connection are yours, and the sewer diagram comes with the contract.
Water and sewer
Sydney Water runs the water and wastewater network. Building over or near its pipes needs approval through its Tap in service.
Stormwater
Councils run local stormwater; Sydney Water runs some major channels. Keep overland flow paths clear.
Insurance
Australia has no government natural disaster cover for homes, so your private home insurance carries it all. Check that the policy covers flood (most now do, but premiums in mapped flood areas can be high), storm, bushfire and actions of the sea, and that the sum insured covers a full rebuild including demolition and debris removal. Get a quote for the address before you commit, and arrange cover from the day the risk passes to you under the contract.
Renovate and approvals
NSW has three pathways. Exempt development needs no approval if it meets the state codes. Complying development gets a fast complying development certificate (CDC) from council or a registered certifier. Everything else needs a development application (DA) to council, then a construction certificate before work starts. Some work needs both, some needs neither, and exempt work must still meet the building rules.
Do I need approval? (New South Wales)
Pick the job. This is a first answer based on the NSW rules; conditions apply and your council (Greater Sydney has more than thirty) or your building surveyor or certifier has the final say.
The order that saves money
- Survey the existing building Approvals on file, a condition report and a measured plan. Know what is approved before you design.
- Envelope first Roof, gutters, walls, windows and drainage. Interiors installed inside a leaking or damp shell get redone.
- Structure and services next Footings, framing, wiring, plumbing, insulation and ventilation while linings are off.
- Then finishes Kitchens, bathrooms, floors and paint last, when nothing behind them will need opening again.
- Close it out Get the final inspection or occupancy certificate. Keep compliance certificates from plumbers and electricians, engineer's certificates, warranties and approved plans for resale.
Rules worth knowing in New South Wales
Licensed builders and warranty insurance
Builders must take out Home Building Compensation Fund cover for residential work over $20,000 and give you the certificate before taking money. New strata buildings carry a 2% building bond for defects.
Owner-builders
Owner-builder permits from NSW Fair Trading are needed for work above the threshold that needs a DA or CDC.
Strata, owners corporations and bodies corporate
Work that touches common property (external walls, windows, balconies, waterproofing, floors over other units) needs the scheme's approval, even when the council is not involved.
Asbestos and lead
Asbestos was used widely until the mid-1980s and banned in Australia from 31 December 2003, so any home built or renovated before 1990 may contain it (fibro sheet, eaves, vinyl tiles, flues, fences). Older paint may contain lead. Test before you cut, drill or sand.
Regulator: Building Commission NSW.
The cost of buying and owning, beyond the mortgage
Enter your own numbers. The defaults are placeholders, not Sydney averages; replace them with the official duty calculator, your council's rates notice, an insurance quote and your maintenance plan.
Upfront cost to buy
Work out stamp duty with the Revenue NSW transfer duty calculator, and the transfer and mortgage registration fees (NSW Land Registry Services). Lenders mortgage insurance usually applies when the deposit is under 20%.
First home buyers in New South Wales
First home buyers pay no transfer duty on a home up to $800,000, with a concession up to $1,000,000 (vacant land: $350,000 and $450,000). You must move in within 12 months and live there for 12 months. Rules and caps change; check the revenue office before you sign. The federal First Home Guarantee and other schemes can also help with a smaller deposit.
10-year ownership cost
Costs are in today's dollars except where an increase is set. Maintenance is based on the building, not the land. Land tax does not apply to your own home but does to investment property. An emergency services levy is collected with rates or water bills in most states (in NSW it is in insurance premiums).
A maintenance calendar that prevents the expensive repairs
Autumn (Mar–May)
- Clear gutters and downpipes, especially near bush
- Check roof tiles and flashings
- Service air conditioning before winter heating
Winter (Jun–Aug)
- Watch for damp and mould in bathrooms and wardrobes
- Check subfloor ventilation
- Look for termite mud leads near damp areas
Spring (Sep–Nov)
- Termite inspection every year
- Re-seal wet areas, balconies and windows
- Prepare for bushfire season: clear gutters and vegetation
Summer (Dec–Feb)
- Check after summer storms: roof, gutters, trees
- Service pool barrier and gate latches
- Test smoke alarms; replace after 10 years
Selling
Most of the result is set before the first open for inspection: the price expectation, the method, the campaign spend and how much you fix first. Work out what you will actually take home before you pick an agent.
What will I walk away with?
GST of 10% is added to commission. Commission, marketing and auctioneer fees are negotiable; use the figures in the agency agreement you are offered.
Questions to settle with an agent before you sign
- Evidence for the price Ask for recent sales of comparable homes, not online estimates or a promise of a high number.
- Method and timing Why auction, private sale or expressions of interest for this house and this market, and what happens if it does not sell.
- All the costs in writing Commission and GST, marketing (often paid up front even if it does not sell), auctioneer, and when each is payable.
- Agreement term Exclusive agency length, the cooling-off on the agency agreement, and how to end it.
- Disclosure Get the NSW vendor documents ready early and be upfront about approvals, defects and repairs; it is cheaper than a dispute after exchange.
Tax: your main residence is usually exempt from capital gains tax. From 1 January 2025 every seller needs an ATO clearance certificate at settlement, whatever the price, or the buyer must withhold 15% of the price. Apply early on the ATO website.
Research an area
Suburb names hide big differences in ground, house age and rules. These are the free official sources that answer the useful questions for one address.
- NSW Planning PortalSpatial viewer: zoning, heritage, flood and bushfire layers; exempt and complying development guides.
- NSW Land Registry ServicesTitle searches, plans and dealings.
- Revenue NSWTransfer duty calculator, first home buyer scheme and land tax.
- NSW Fair TradingBuying and selling, strata living, licence checks and the loose-fill asbestos register.
- Valuer General NSWLand values used for rates and land tax.
- Sydney WaterBuilding over pipes, sewer diagrams and water charges.
- School finderPublic school catchments for an address.
- Building Commission NSWBuilding defects, apartment building orders and builder checks.
- ABS Census QuickStatsWho lives in a suburb: age, households, tenure and dwelling types.
- Asbestos Safety and Eradication AgencyWhere asbestos hides in homes and how to handle it.
- MoneysmartHome loan, deposit and repayment calculators from ASIC.
Five questions for any suburb
- When were most houses built? It tells you which era problems to look for (see the decoder under Choose a house).
- What is under it? Clay, sand, rock, fill or low wet ground changes footings, cracking and drainage.
- Where does the water and fire go? Flood mapping, overland flow, bushfire overlays and the age of the drains.
- What does the zone allow? Neighbours may be able to build up and closer; your own extension options depend on it too.
- What does it rent and sell for? Rents and recent sales are a reality check on price and on the cost of holding.
General information for Sydney homeowners, written by Auxuro from official sources and checked October 2026. Rules, thresholds and fees change; check with the New South Wales government, your council (Greater Sydney has more than thirty), your conveyancer or solicitor, an independent building inspector and other qualified advisers before you rely on it for a decision.