Adelaide Home Owner's Handbook
A working handbook for the whole life of an Adelaide home: what to check before you sign, what the land and the building era tell you, what needs approval, what owning really costs, and how a sale nets out. Each tab has a tool you can use on a real property.
Choose a house: read its era, its title and its block
Price and layout are easy to compare. Three things are not, and they drive most of the surprises after settlement: how and when the house was built, what kind of title it sits on, and what the ground under it does in heavy rain, heat or fire.
House-era decoder
Pick when the house (or the part you are looking at) was built. You get the usual construction in Adelaide, the weak points inspectors look for, and the questions to ask.
Title types you will meet in Adelaide
| Title | What you own | Watch for |
|---|---|---|
| Torrens title | The land and the house on it. | Easements, encumbrances and land management agreements on the Certificate of Title. |
| Strata title | A unit with common property run by a strata corporation (older schemes). | Levies, sinking fund, minutes and building maintenance. |
| Community title | A lot in a community scheme, common for newer units and townhouses. | By-laws, levies, scheme description and shared driveway or services costs. |
Ask your conveyancer for the title search and every instrument registered on it before you commit.
How it is being sold changes how you prepare
Auction
Unconditional, with no cooling-off. Inspections and finance first.
Private treaty
Offers can be conditional. Cooling-off runs to the end of the second clear business day after the Form 1 is served.
Best offer by a set date
Common in Adelaide. Treat it like a private sale; ask whether early offers will be considered.
Verify before you commit
Once the contract is unconditional you are committed. Use the time before you sign, and any cooling-off or conditions, to turn unknowns into a price, a fix or a walk-away. This checklist saves in your browser so you can run one property at a time.
What the seller must give you (SA)
In SA the seller must serve a vendor's statement (Form 1) before settlement: title, encumbrances, council and planning information, building approvals, notices, and strata or community details. Most sellers give it with the contract.
Cooling-off (SA)
Cooling-off: until the end of the second clear business day after the Form 1 is served (or the contract is made, if later). The seller can keep a deposit only if it was $100 or less. There is no cooling-off at auction.
Due diligence checklist
Checklist for one property
0 done ·Unapproved work: how to handle it
Find it
Compare the approvals on the council's file with what is on site. Built-in garages and carports, rooms under houses, decks, pergolas, granny flats, extra bathrooms and pools are the usual gaps.
Size it
Cosmetic work rarely matters. Structure, wet areas, drainage, retaining walls and anything near a boundary matter more, because they affect safety, insurance, lending and resale.
Fix the paperwork
Councils and building surveyors can often approve existing work after the fact (names differ by state: building certificate, certificate of final inspection, retrospective approval), but they may ask to open up linings or require upgrades.
Decide
Options are: the seller gets it approved before settlement, a price reduction that covers the fix, a specific condition, or walking away. Tell your insurer and lender what you know.
Land and water hazards
Adelaide sits on plains of highly reactive clay that swell and shrink with the seasons, with stony hills to the east. Old stone homes suffer salt damp, the Adelaide Hills face bushfire risk, and creeks such as Brown Hill and Keswick Creek and the Gawler River can flood. Insurers, lenders and councils all look harder at this now. Check these layers for any address before you commit.
| Hazard | What it looks like on site | Where to check | Who to ask |
|---|---|---|---|
| Reactive clay | Cracks in walls that open in summer and close in winter, sticking doors, gaps at cornices. | Building inspection; site classification on approvals. | A structural engineer if cracks are wide or growing. |
| Salt damp | Crumbling mortar and stone near the ground, tide marks, flaking paint. | Building inspection. | A salt damp specialist; ask about guarantees. |
| Flooding | Low land near creeks and the Gawler River, low streets. | SAPPA hazard overlays; council flood mapping. | Insurer; a drainage engineer. |
| Bushfire | Adelaide Hills and the bush edge. | Planning and Design Code bushfire overlays on SAPPA. | A bushfire consultant for a BAL rating. |
| Coastal hazards | Seafront sites, sand dunes. | Coastal overlays; Coast Protection Board advice. | A coastal engineer. |
| Termites | Mud leads and damaged timber. | Pre-purchase building and pest inspection. | A licensed pest inspector. |
| Site contamination | Former industrial sites, service stations, landfill. | EPA South Australia site contamination index. | An environmental consultant. |
Who looks after which pipe
Your private drains
House drains to the connection point are yours to maintain.
Water and sewer
SA Water runs water and sewerage. Building over or near its pipes needs approval.
Stormwater
Councils run local stormwater and watercourses; new work often needs rainwater tanks or detention.
Insurance
Australia has no government natural disaster cover for homes, so your private home insurance carries it all. Check that the policy covers flood (most now do, but premiums in mapped flood areas can be high), storm, bushfire and actions of the sea, and that the sum insured covers a full rebuild including demolition and debris removal. Get a quote for the address before you commit, and arrange cover from the day the risk passes to you under the contract.
Renovate and approvals
In SA a development approval usually combines planning consent (against the Planning and Design Code) and building consent (against the Building Code). Applications go through the PlanSA portal to council or an accredited professional. Some work needs both, some needs neither, and exempt work must still meet the building rules.
Do I need approval? (South Australia)
Pick the job. This is a first answer based on the SA rules; conditions apply and your council (metropolitan Adelaide has about twenty) or your building surveyor or certifier has the final say.
The order that saves money
- Survey the existing building Approvals on file, a condition report and a measured plan. Know what is approved before you design.
- Envelope first Roof, gutters, walls, windows and drainage. Interiors installed inside a leaking or damp shell get redone.
- Structure and services next Footings, framing, wiring, plumbing, insulation and ventilation while linings are off.
- Then finishes Kitchens, bathrooms, floors and paint last, when nothing behind them will need opening again.
- Close it out Get the final inspection or occupancy certificate. Keep compliance certificates from plumbers and electricians, engineer's certificates, warranties and approved plans for resale.
Rules worth knowing in South Australia
Licensed builders and warranty insurance
Builders must take out building indemnity insurance for domestic work over $12,000, covering you for 5 years if the builder dies, disappears or becomes insolvent.
Owner-builders
Owner-builders must disclose the work if they sell within five years, and buyers then have no indemnity cover.
Strata, owners corporations and bodies corporate
Work that touches common property (external walls, windows, balconies, waterproofing, floors over other units) needs the scheme's approval, even when the council is not involved.
Asbestos and lead
Asbestos was used widely until the mid-1980s and banned in Australia from 31 December 2003, so any home built or renovated before 1990 may contain it (fibro sheet, eaves, vinyl tiles, flues, fences). Older paint may contain lead. Test before you cut, drill or sand.
Regulator: Consumer and Business Services (CBS).
The cost of buying and owning, beyond the mortgage
Enter your own numbers. The defaults are placeholders, not Adelaide averages; replace them with the official duty calculator, your council's rates notice, an insurance quote and your maintenance plan.
Upfront cost to buy
Work out stamp duty with the RevenueSA stamp duty calculator, and the transfer and mortgage registration fees (Land Services SA). Lenders mortgage insurance usually applies when the deposit is under 20%.
First home buyers in South Australia
First home buyers of a new home, off-the-plan apartment or land to build on pay no stamp duty, with no price cap for contracts from 6 June 2024. There is no first home concession for established homes. Rules and caps change; check the revenue office before you sign. The federal First Home Guarantee and other schemes can also help with a smaller deposit.
10-year ownership cost
Costs are in today's dollars except where an increase is set. Maintenance is based on the building, not the land. Land tax does not apply to your own home but does to investment property. An emergency services levy is collected with rates or water bills in most states (in NSW it is in insurance premiums).
A maintenance calendar that prevents the expensive repairs
Autumn (Mar–May)
- Clear gutters before winter
- Check stormwater runs away from the walls
- Service heaters
Winter (Jun–Aug)
- Watch for damp and salt damp signs
- Check for leaks in the first big rains
- Keep garden beds below damp-proof courses
Spring (Sep–Nov)
- Prepare for bushfire season if near the Hills
- Termite inspection every year
- Water around the house consistently to limit clay movement
Summer (Dec–Feb)
- Service evaporative coolers and air conditioning
- Check cracks after the dry months
- Test smoke alarms; replace after 10 years
Selling
Most of the result is set before the first open for inspection: the price expectation, the method, the campaign spend and how much you fix first. Work out what you will actually take home before you pick an agent.
What will I walk away with?
GST of 10% is added to commission. Commission, marketing and auctioneer fees are negotiable; use the figures in the agency agreement you are offered.
Questions to settle with an agent before you sign
- Evidence for the price Ask for recent sales of comparable homes, not online estimates or a promise of a high number.
- Method and timing Why auction, private sale or expressions of interest for this house and this market, and what happens if it does not sell.
- All the costs in writing Commission and GST, marketing (often paid up front even if it does not sell), auctioneer, and when each is payable.
- Agreement term Exclusive agency length, the cooling-off on the agency agreement, and how to end it.
- Disclosure Get the SA vendor documents ready early and be upfront about approvals, defects and repairs; it is cheaper than a dispute after exchange.
Tax: your main residence is usually exempt from capital gains tax. From 1 January 2025 every seller needs an ATO clearance certificate at settlement, whatever the price, or the buyer must withhold 15% of the price. Apply early on the ATO website.
Research an area
Suburb names hide big differences in ground, house age and rules. These are the free official sources that answer the useful questions for one address.
- SA Property and Planning Atlas (SAPPA)Zone, overlays, heritage, flood and bushfire for any address.
- PlanSAThe Planning and Design Code, the approval wizard and development applications.
- Land Services SATitle searches, plans and property interest reports.
- RevenueSAStamp duty calculator, first home buyer relief, land tax.
- Consumer and Business ServicesBuying and selling, Form 1, cooling-off, licence checks, building indemnity insurance.
- SA WaterWater and sewer assets and charges.
- EPA South AustraliaSite contamination index and environmental information.
- Department for Education SASchool zones for an address.
- ABS Census QuickStatsWho lives in a suburb: age, households, tenure and dwelling types.
- Asbestos Safety and Eradication AgencyWhere asbestos hides in homes and how to handle it.
- MoneysmartHome loan, deposit and repayment calculators from ASIC.
Five questions for any suburb
- When were most houses built? It tells you which era problems to look for (see the decoder under Choose a house).
- What is under it? Clay, sand, rock, fill or low wet ground changes footings, cracking and drainage.
- Where does the water and fire go? Flood mapping, overland flow, bushfire overlays and the age of the drains.
- What does the zone allow? Neighbours may be able to build up and closer; your own extension options depend on it too.
- What does it rent and sell for? Rents and recent sales are a reality check on price and on the cost of holding.
General information for Adelaide homeowners, written by Auxuro from official sources and checked October 2026. Rules, thresholds and fees change; check with the South Australia government, your council (metropolitan Adelaide has about twenty), your conveyancer or solicitor, an independent building inspector and other qualified advisers before you rely on it for a decision.