Brisbane Home Owner's Handbook
A working handbook for the whole life of a Brisbane home: what to check before you sign, what the land and the building era tell you, what needs approval, what owning really costs, and how a sale nets out. Each tab has a tool you can use on a real property.
Choose a house: read its era, its title and its block
Price and layout are easy to compare. Three things are not, and they drive most of the surprises after settlement: how and when the house was built, what kind of title it sits on, and what the ground under it does in heavy rain, heat or fire.
House-era decoder
Pick when the house (or the part you are looking at) was built. You get the usual construction in Brisbane, the weak points inspectors look for, and the questions to ask.
Title types you will meet in Brisbane
| Title | What you own | Watch for |
|---|---|---|
| Freehold | The land and the house on it. | Easements, covenants and any registered building management statement. |
| Community titles scheme (body corporate) | Your lot plus a share of common property, run by a body corporate. | Levies, sinking fund forecast, by-laws, minutes and any disputes or defect claims. |
| Leasehold | A lease of state or private land. | Rare in Brisbane. Check the lease term, rent and lender appetite. |
Ask your conveyancer for the title search and every instrument registered on it before you commit.
How it is being sold changes how you prepare
Auction
Unconditional, with no cooling-off. Do finance, building and pest, flood checks and the contract review first.
Private treaty
Offers can be subject to finance and building and pest inspections. A 5 business day cooling-off period applies.
Offers over or price by negotiation
Common in Brisbane. Treat it like a private sale and plan your checks to fit the contract dates.
Verify before you commit
Once the contract is unconditional you are committed. Use the time before you sign, and any cooling-off or conditions, to turn unknowns into a price, a fix or a walk-away. This checklist saves in your browser so you can run one property at a time.
What the seller must give you (QLD)
From 1 August 2025 Queensland sellers must give you a seller disclosure statement with prescribed certificates before you sign: title search, rates and water notices, zoning, flood and other notices, pool safety, and body corporate information for units. If it is missing or wrong you may be able to terminate before settlement.
Cooling-off (QLD)
Cooling-off: 5 business days. If you end the contract the seller can keep up to 0.25% of the price from the deposit. There is no cooling-off at auction, and you can waive or shorten it in writing.
Due diligence checklist
Checklist for one property
0 done ·Unapproved work: how to handle it
Find it
Compare the approvals on the council's file with what is on site. Built-in garages and carports, rooms under houses, decks, pergolas, granny flats, extra bathrooms and pools are the usual gaps.
Size it
Cosmetic work rarely matters. Structure, wet areas, drainage, retaining walls and anything near a boundary matter more, because they affect safety, insurance, lending and resale.
Fix the paperwork
Councils and building surveyors can often approve existing work after the fact (names differ by state: building certificate, certificate of final inspection, retrospective approval), but they may ask to open up linings or require upgrades.
Decide
Options are: the seller gets it approved before settlement, a price reduction that covers the fix, a specific condition, or walking away. Tell your insurer and lender what you know.
Land and water hazards
Brisbane is a river city of steep ridges and low creek flats. Large areas flood from the Brisbane River and its creeks (1974, 2011 and 2022), storms bring overland flow and hail, steep slopes slip in heavy rain, and termites are everywhere. Insurers, lenders and councils all look harder at this now. Check these layers for any address before you commit.
| Hazard | What it looks like on site | Where to check | Who to ask |
|---|---|---|---|
| River and creek flooding | Low land near the river or creeks, flood marks, rooms below road level. | Brisbane City Council flood awareness map and FloodWise property report; the seller disclosure statement. | Insurer before you sign; a hydraulic engineer for renovations. |
| Overland flow and storm tide | Water paths across lots, low bayside suburbs. | Council flood awareness map (overland flow, storm tide). | A drainage engineer. |
| Landslide | Steep hillside lots, cracked retaining walls, leaning fences. | City Plan landslide overlay. | A geotechnical engineer. |
| Termites | Mud leads, hollow timber, damage in skirtings and frames. | Pre-purchase building and pest inspection. | A licensed pest inspector every year. |
| Bushfire | Lots on the bushland edge in the west and south. | City Plan bushfire overlay. | A bushfire consultant for a BAL rating. |
| Acid sulfate soils | Low land near the bay and river mouth. | City Plan overlays. | An environmental or geotechnical engineer before earthworks. |
| Contaminated land | Former industrial sites, service stations, dips. | Queensland environmental management and contaminated land registers. | An environmental consultant. |
Who looks after which pipe
Your private drains
House drains to the connection point are yours to maintain.
Water and sewer
Urban Utilities runs water and sewerage in Brisbane. Building over or near its pipes needs its approval.
Stormwater
Brisbane City Council runs public stormwater and the flood mapping.
Insurance
Australia has no government natural disaster cover for homes, so your private home insurance carries it all. Check that the policy covers flood (most now do, but premiums in mapped flood areas can be high), storm, bushfire and actions of the sea, and that the sum insured covers a full rebuild including demolition and debris removal. Get a quote for the address before you commit, and arrange cover from the day the risk passes to you under the contract.
Renovate and approvals
Queensland separates building approval, usually issued by a private building certifier, from development (planning) approval under your council's planning scheme. In Brisbane that is City Plan 2014, whose overlays (character, heritage, flood) decide what you can change. Some work needs both, some needs neither, and exempt work must still meet the building rules.
Do I need approval? (Queensland)
Pick the job. This is a first answer based on the QLD rules; conditions apply and Brisbane City Council (or Logan, Moreton Bay, Ipswich or Redland if you are outside the city) or your building surveyor or certifier has the final say.
The order that saves money
- Survey the existing building Approvals on file, a condition report and a measured plan. Know what is approved before you design.
- Envelope first Roof, gutters, walls, windows and drainage. Interiors installed inside a leaking or damp shell get redone.
- Structure and services next Footings, framing, wiring, plumbing, insulation and ventilation while linings are off.
- Then finishes Kitchens, bathrooms, floors and paint last, when nothing behind them will need opening again.
- Close it out Get the final inspection or occupancy certificate. Keep compliance certificates from plumbers and electricians, engineer's certificates, warranties and approved plans for resale.
Rules worth knowing in Queensland
Licensed builders and warranty insurance
Residential work over $3,300 must be done by a QBCC-licensed contractor and covered by the QBCC Home Warranty Scheme, which covers structural defects for 6 years and 6 months.
Owner-builders
Owner-builder permits from the QBCC are needed for work above the threshold, and the work must be disclosed on sale.
Strata, owners corporations and bodies corporate
Work that touches common property (external walls, windows, balconies, waterproofing, floors over other units) needs the scheme's approval, even when the council is not involved.
Asbestos and lead
Asbestos was used widely until the mid-1980s and banned in Australia from 31 December 2003, so any home built or renovated before 1990 may contain it (fibro sheet, eaves, vinyl tiles, flues, fences). Older paint may contain lead. Test before you cut, drill or sand.
Regulator: Queensland Building and Construction Commission (QBCC).
The cost of buying and owning, beyond the mortgage
Enter your own numbers. The defaults are placeholders, not Brisbane averages; replace them with the official duty calculator, your council's rates notice, an insurance quote and your maintenance plan.
Upfront cost to buy
Work out stamp duty with the Queensland Revenue Office transfer duty estimator, and the transfer and mortgage registration fees (Titles Queensland). Lenders mortgage insurance usually applies when the deposit is under 20%.
First home buyers in Queensland
First home buyers of a new home pay no transfer duty, with no price cap (from 1 May 2025). For an established home, the first home concession applies under $800,000. From 1 August 2026 these concessions are limited to citizens, permanent residents and specified foreign retirees. Rules and caps change; check the revenue office before you sign. The federal First Home Guarantee and other schemes can also help with a smaller deposit.
10-year ownership cost
Costs are in today's dollars except where an increase is set. Maintenance is based on the building, not the land. Land tax does not apply to your own home but does to investment property. An emergency services levy is collected with rates or water bills in most states (in NSW it is in insurance premiums).
A maintenance calendar that prevents the expensive repairs
Autumn (Mar–May)
- Clear gutters before winter and check for hail damage
- Service air conditioning filters
- Check stumps and the subfloor while it is dry
Winter (Jun–Aug)
- Inspect timber verandahs, stairs and battens
- Fix leaks before the storm season
- Trim trees near the roof
Spring (Sep–Nov)
- Prepare for storm season (Oct–Mar): gutters, loose items, emergency kit
- Termite inspection every year
- Re-seal wet areas and windows
Summer (Dec–Feb)
- Check roof and gutters after storms
- Watch for mould in wardrobes and ceilings in humid weather
- Test smoke alarms: Queensland is phasing in interconnected photoelectric alarms
Selling
Most of the result is set before the first open for inspection: the price expectation, the method, the campaign spend and how much you fix first. Work out what you will actually take home before you pick an agent.
What will I walk away with?
GST of 10% is added to commission. Commission, marketing and auctioneer fees are negotiable; use the figures in the agency agreement you are offered.
Questions to settle with an agent before you sign
- Evidence for the price Ask for recent sales of comparable homes, not online estimates or a promise of a high number.
- Method and timing Why auction, private sale or expressions of interest for this house and this market, and what happens if it does not sell.
- All the costs in writing Commission and GST, marketing (often paid up front even if it does not sell), auctioneer, and when each is payable.
- Agreement term Exclusive agency length, the cooling-off on the agency agreement, and how to end it.
- Disclosure Get the QLD vendor documents ready early and be upfront about approvals, defects and repairs; it is cheaper than a dispute after exchange.
Tax: your main residence is usually exempt from capital gains tax. From 1 January 2025 every seller needs an ATO clearance certificate at settlement, whatever the price, or the buyer must withhold 15% of the price. Apply early on the ATO website.
Research an area
Suburb names hide big differences in ground, house age and rules. These are the free official sources that answer the useful questions for one address.
- Brisbane flood awareness mapRiver, creek, overland flow and storm tide flooding for an address, and the FloodWise property report.
- Brisbane City PlanZones and overlays: character, heritage, flood, landslide, bushfire.
- Titles QueenslandTitle searches and survey plans.
- Queensland Revenue OfficeTransfer duty estimator, home and first home concessions, land tax.
- QBCCLicence checks, home warranty, building approvals and defects.
- Queensland GlobeProperty boundaries, aerial imagery and state mapping layers.
- Urban UtilitiesWater and sewer assets, building over pipes.
- Buying and owning a homeQueensland Government guides: seller disclosure, contracts, cooling-off.
- ABS Census QuickStatsWho lives in a suburb: age, households, tenure and dwelling types.
- Asbestos Safety and Eradication AgencyWhere asbestos hides in homes and how to handle it.
- MoneysmartHome loan, deposit and repayment calculators from ASIC.
Five questions for any suburb
- When were most houses built? It tells you which era problems to look for (see the decoder under Choose a house).
- What is under it? Clay, sand, rock, fill or low wet ground changes footings, cracking and drainage.
- Where does the water and fire go? Flood mapping, overland flow, bushfire overlays and the age of the drains.
- What does the zone allow? Neighbours may be able to build up and closer; your own extension options depend on it too.
- What does it rent and sell for? Rents and recent sales are a reality check on price and on the cost of holding.
General information for Brisbane homeowners, written by Auxuro from official sources and checked October 2026. Rules, thresholds and fees change; check with the Queensland government, Brisbane City Council (or Logan, Moreton Bay, Ipswich or Redland if you are outside the city), your conveyancer or solicitor, an independent building inspector and other qualified advisers before you rely on it for a decision.