Online training
MVHR Plan training
A heat recovery system only works when supply and extract balance. MVHR Plan colours each room as supply, extract or transfer, adds up both sides, and tells you when they do not match.
0.35 ACHThe whole-house ventilation rate the layout is sized to
50–60%Where the unit should sit on its fan curve at design flow, so it runs quiet and can boost
Ø90 / Ø160Radial tube to each valve, and the insulated duct to outside
How the room types work
Supply
- Bedrooms, living rooms, studies: anywhere people sit still and breathe.
- Fresh, tempered air comes in here through a ceiling or wall valve.
Extract
- Kitchen, bathrooms, laundry, toilets: anywhere moisture or smell is made.
- Wet rooms set the minimum, so extract is usually what drives the unit size.
Transfer
- Hallways and stairs carry air from supply rooms back to the extract rooms.
- They need a gap under the door or a transfer grille, or the balance never happens.
Step by step
- Draw and tagTrace the plan and tag every room. The colour tells you at a glance which side it is on.
- Set the rateStart at 0.35 ACH for the whole house, then check the wet-room minimums on top.
- Balance the two sidesSupply total and extract total have to match. The tool shows the gap as you go.
- Place the unitSomewhere warm, serviceable and not over a bedroom, with a condensate drain and outside wall access.
- Run the tubesOne Ø90 radial tube per valve back to the manifold. Keep runs similar in length so balancing is easy.
- Check the duty pointAim for 50–60% of the unit’s capacity at design flow, so boost is still available and it stays quiet.
- Valves, grilles and pricePick valve sizes, add the transfer grilles, then take off the tube, fittings and labour.
What the tool checks for you
| Check | What it means | What to do when it flags |
|---|---|---|
| Supply vs extract | The two totals do not match | Raise the smaller side, or re-tag a room |
| Wet room minimum | A kitchen or bathroom is below its required extract | Increase that room, then re-balance the supply side |
| Unit duty | Design flow sits too high or too low on the fan curve | Change unit size; too high means no boost headroom and more noise |
| Transfer path | A supply room has no way to pass air back | Add a door undercut or a transfer grille |
Common mistakes
Layout
- Putting the unit in an unheated roof space, where the ducts sweat and the heat recovery is wasted.
- Running the outside ducts uninsulated, which condenses in winter.
Balance
- Sealing doors so well that no air can transfer, then wondering why bedrooms are stuffy.
- Counting the range hood as the kitchen extract. It is a separate system.