Heat loss is mostly arithmetic, and the arithmetic is easy to get subtly wrong. EnergyPlan builds the envelope layer by layer so the R-values, the loads and the compliance check all come off the same model.
H1 / NCCThe New Zealand and Australian energy efficiency requirements it checks against
R-valueBuilt up from each layer, not typed in as a single number
ACH₅₀Airtightness at 50 Pa, which the infiltration loss is derived from
Build the envelope first
Layers, not numbers
- Each wall, roof and floor is assembled from its real layers: cladding, cavity, insulation, lining.
- Thermal bridging through framing is taken off the top, which is where hand calculations usually flatter the result.
Windows carry most of it
- Frame and glass are separate; a good unit in a bad frame performs like a bad window.
- Orientation matters for cooling as much as R-value matters for heating.
Then the climate
- Pick the climate zone before you read any load. Every number downstream depends on it.
Step by step
- Draw the planTrace the building and set the storey height. Volumes come from this.
- Set the climate zoneNZ H1 zones or the NCC climate zone, depending on where the job is.
- Assemble the constructionsBuild each wall, roof and floor from its layers and let the tool work out the R-value.
- Add the windowsPlace them by orientation with their frame and glazing type.
- Set airtightnessUse a measured ACH₅₀ if you have one, or a realistic assumption for the build quality.
- Read the loadsHeating and cooling loads per room and for the whole house, with the breakdown by element.
- Check complianceRun the H1 or NCC check and look at which element is holding you back.
Reading the result
| What you see | What it usually means | Where to look |
|---|---|---|
| Heating load much higher than similar houses | Glazing area, airtightness or a missing insulation layer | The element breakdown; one line is usually carrying it |
| Cooling load dominated by one room | West or north glazing without shading | That room’s window orientation and shading |
| H1 fails on one element | That construction is below the schedule minimum | Add insulation there, or move to the calculation method |
| Heat pump looks oversized | Sized on peak load with no diversity or recovery allowance | Size on the load, then check the part-load behaviour |